Same footprint
More rentable area without a new roof: clear height turns into square metres that used to stay empty.
Product
A second floor on the same plot. More rentable area without a new roof: steel structure for self-storage operators.
Steelaxy mezzanines turn clear height into rentable square metres. We design the structure to carry partitions on the upper level, with access and electrical integration planned from the study.
Reference capacity: about 500 m² of mezzanine per week, in fabrication and assembly.

More rentable area without a new roof: clear height turns into square metres that used to stay empty.
More units in the same envelope. Land and shell cost is spread across more rented square metres.
The mezzanine is sized to carry Steelaxy partitions on the upper level. One construction vocabulary, on the ground floor and above.
Height is the first filter: the more clear height, the likelier a second floor makes sense. The study confirms it with the floor plan and the building.
Other points weigh on the decision, and they are easier to handle early, before the design is closed:
Leaving access or regulation until the end is an easy mistake to avoid: if they enter the study on day one, the second-floor design is adjusted to the building from the start.
See the full method.
If the plan is not final, the Capacity estimator gives an order of magnitude from the usable area. With the plan and the height, the study says whether the second floor makes sense and how the partitions sit above.
The study covers each point from the floor plan and the clear height.
About 500 m² of mezzanine per week, in fabrication and assembly. The schedule for each project is set in the proposal, after the study.
It depends on clear height, structure and the building. The study assesses it from the floor plan. If you know the height, include it in your request.
The mezzanine is designed to carry Steelaxy partitions on the upper level. They can be studied and assembled together.
Yes. Stairs, guardrails and circulation are part of the design.
We do not publish prices. They depend on the area, the height and the scope. We give them in the proposal, after the study.
It depends on the scope. The schedule is proposed after the study and coordinated with the operator's calendar.
It depends on the building, the use and the country. It is one of the points to review in the study, with the floor plan and the operator's requirements.



Get an order-of-magnitude estimate or send the floor plan for a study.